Rawalpindi – Islamabad Metro Bus Project (Package III) 6th Avenue Road to I.J.P Rd
Client: Rawalpindi Development Authority
Scope of Work:
- Elevated Portion 2.5 KM
- Pre-Eng Bus Stations 3 Nos
- At Grade 3-Lane Roads 5.0 KM
- At Grade 2-Lane Srvce Road 5.0 KM
Key Items of Work
- Concrete 100,000 CM
- Steel Reinforcement 14,000 TON
- Asphalt base/wearing 20,620 TON
- Sub-Base / WBM 15,000 CM